Permit Information
Minnetonka, MN
Everything you need to know about permits for concrete and asphalt work in Minnetonka.
Permit requirements, fees, and regulations are subject to change. This information is for general reference only. Please verify details directly with Minnetonka's building department before making any decisions.
Permit Required
- •Any new or realigned driveway
- •Replacement of an existing driveway
- •Any project crossing the right-of-way
Permit Type: Driveway Permit
Max Width: 20 ft (2-car), 30 ft (3-car)
Permit Not Required
- •Seal coating
- •Patching or minor maintenance
Must be 45 ft minimum from any corner. Maximum 10% slope. For concrete on asphalt curb streets, stop 2 ft short of road - Public Works paves final section.
Key Facts
5-10
Days for Plan Review
180
Days Before Permit Expires
20 ft (2-car), 30 ft (3-car)
Maximum Driveway Width
How to Apply
Submit your application through the City of Minnetonka's ePermits system.
Visit Permit PortalContact
Senior Civil Engineer
952-939-8238Property on a County Road?
If your driveway accesses a Hennepin County road (not a city street), contact Hennepin County for permitting requirements.
